In autumn 2007 tagebau were commissioned by GP Schuppertbau, a general contractor in Halle / Saale to develop the detail design, the construction information including specifications and bills of quantities for 7 appartement buildings with underground car parking and the landscaping in Potsdam. The just under 100 appartements were designed to the so-called kfW-60 energy standard, i.e. 30% better than the current German energy standard.
Construction started in summer 2008 and completion is planned for late spring 2009.