[image 1/1]

construction starts at bornaische bridge leipzig

construction start for the new bridge in leipzig connewitz that is to replace an old steel bridge over the railway line leading to the leipzig city tunnel.tagebau were commissioned to develop the balustrade and the bridge edges.
array
  • location: leipzig - connewitz
  • scope: detail design, rc spec
  • client: city of leipzig
/